List of Projects MetPlus Client meetings Meeting 29 - 11/04/2016

Meeting 29 - 11/04/2016

Updated almost 3 years ago by Joao Pereira
1. Retrospective on Sprint 27

1.1 Waffle stories completed during the sprint:
  • Add auth to job applications controller #438 by (nchristian777)
  • Add acceptance test steps to verify email validation #463 by (patmbolger)
  • Add config file for rubocop #472 by (patmbolger)
  • Activate Houndci #471 by (joaopapereira)
  • Uniform display of job app reject error #458 by (patmbolger)
  • Review cancel action for all forms #449 by (patmbolger)
  • Add Pundit auth to company people controller #434 by (arun1595)
  • Enhance tasks - company person page #424 by (patmbolger)
  • Stub email validate in seeds.rb #470 by (patmbolger)
  • Bug: email validation breaks seeds.rb #468 by (patmbolger)
  • Metplus favicon #201 by (joaopapereira)
  • Agency person edit page: ambiguous wording #448 by (joaopapereira)
  • Missing controller tests for CompanyPeopleController #469 by (rijimuge)
       ===== Cruncher ====
  • Updated interface and documentation # by (joaopapereira)
  • Add missing job search # by (joaopapereira)
  • On matching was not checking if Job exists # by (joaopapereira)
  • Cruncher API: match job<>résumé #324 by (joaopapereira)

1.2. Other Waffle stories/items worked on during the sprint:
  • Ensure dates are in correct timezone(#292)
  • Update the resume after application submited (#427)
  • Add authorization for Job Seeker(#440)
  • Add authorization for Agency Branches(#435)
  • Add Authorization to jobs controller(#441)
  • Add Authorization to company registrations (#437)
  • Update Job on Cruncher (#480)
  • Duplicated notifications on job application rejection and accept (#456)
  • Add tests to companies controller (#473)
  • Download a resume as an employer (#445)
  • Add jasmine tests for utc-to-local-timezone (#479)
2. Questions for the client
  • Followup on the Category topic
  • Talk about timeline of deployment
3. Questions from the client

4. Priorities for next sprint ( sprint 29, starting Monday, 11/07/16 )
  • Review "MVP List" to talk about priorities

5. Schedule next client meeting for 11/18/2016 at 5.30 pm EST

6. Action points from this meeting:
Revisions

comments powered by Disqus